Skip to main content
Same day service across Sydney.Call 0404133082

Painting services in Sydney

House and commercial painting in Sydney

Interior, exterior, wall, driveway and commercial painting for homes and businesses across greater Sydney. Every surface is washed, filled, sanded and primed before a topcoat goes near it.

Licensed and insured. Same day service.

House and commercial painting in Sydney

Preparation is most of a paint job

  1. Before anything

    Wash the surface

    Paint sticks to a clean surface and to nothing else. Outside that means lifting dirt, chalk, mould and salt, then letting it dry right through. Inside, kitchens and bathrooms get a sugar soap wash, because cooking grease and soap film reject a topcoat.

  2. Then

    Sand back and feather the edges

    Gloss and enamel are sanded so the new coat has something to key into. Where old paint has flaked, the broken edge is sanded until you cannot feel the step with your hand.

  3. Next

    Fill and patch

    Nail holes, dents, cracks and chipped corners are filled, left to dry, then sanded flush. Wider cracks are cut open first so the filler has something to hold instead of sitting in a hairline.

  4. Then

    Caulk the gaps

    The joins between skirting, architrave and wall take a bead of flexible sealant. It is the difference between a room that looks painted and a room that looks finished.

  5. Before any colour

    Seal and prime

    Bare plaster, fresh filler, raw timber and any water stain get a sealer or a primer. Without it the porous patches drink the topcoat and dry to a different sheen, so the wall ends up patchy in raking light.

  6. First coat

    Cut in, then roll

    Edges, corners and trim lines are cut in with a brush, then the field is rolled into the wet edge so the two blend. Cutting in is slow, and it is the part you see from the doorway.

Interior, exterior and commercial painting

Same trade, three different weeks. What changes is the preparation, the product and what sets the timing.

Plasterboard walls, set cornice, ceilings, doors, skirting, architraves and window reveals. The week is set by when the rooms can be cleared, not by the weather, so an interior job can run straight through a wet fortnight without losing a day.

Preparation. Sugar soap through kitchens, bathrooms and laundries first, because cooking grease and soap film will reject a topcoat. Nail holes, dents and cracks are filled and sanded flush, gloss and enamel are sanded to a key, the joins at skirting and architrave take a bead of flexible sealant, and bare plaster, fresh filler and any water stain get spot primed.

Finish. Low sheen acrylic on walls, because it throws back little light and hides the small waves every plastered wall has. Flatter again on ceilings, where a sheen catches every roller mark. Semi gloss on skirting, architraves, doors and wet area walls, where it takes knocks and cleaning. Gloss only on trim that has been prepared for it, and only where the shine is wanted.

What ruins it. Painting over filler nobody sealed. The patch drinks the topcoat, dries to a different sheen, and shows up in raking light for the life of the wall.

Local conditions

What a Sydney property adds to the job

  • Closer to the water

    Near the coast the preparation decides how long an exterior coat lasts, more than the product does. What that means wall by wall is set out on the exterior painting page.

  • Summer heat and humidity

    Heat and humidity change the order of a day rather than the price of it. Inside, coats need longer between them in humid weather; outside, the sun decides which wall gets painted when.

  • The weather window

    A wet run of days stops an outside job and never stops an inside one. Where a quote covers both, that is usually what decides which half happens first.

  • Terraces and semis

    A shared wall, a narrow side path and no room to swing a ladder change how the job is staged. Access gets worked out before the quote, not on the morning.

  • Strata blocks

    Common property, an agreed colour scheme and access to balconies usually need the committee to sign off, and the lift or loading bay has to be booked.

  • Working to somebody else's date

    An end of lease repaint or a pre sale refresh runs to a calendar you did not set. Tell us the date and the scope gets built backwards from it.

What painting work looks like

Interior walls finished in an even coat.
Interior walls finished in an even coat.
An exterior repaint on a weatherboard home.
An exterior repaint on a weatherboard home.
A commercial shopfront painted with clean edges.
A commercial shopfront painted with clean edges.
A driveway coating applied over prepared concrete.
A driveway coating applied over prepared concrete.
A feature wall painted in a deeper tone.
A feature wall painted in a deeper tone.
Paint tools and materials set up before a job.
Paint tools and materials set up before a job.

Questions people ask before booking a painter

The ones that come up before a painting job is booked.

Get your painting quote

Tell us roughly how many rooms or how much wall, whether it is inside, outside or both, and whether ceilings and trim are included. That is enough to quote from.